ASME BPVC 2023 Section XI Division 1

ASME BPVC 2023 Section XI Division 1

July 2023
Standard Current

Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components, Division 1, Rules for Inspection and Testing of Components of Light-Water-Cooled Plants

Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied. DIVISION 1 This Division provides rules for the examination, inspection, and testing; NDE methods, qualifications, and requirements; evaluation and acceptance standards for flaws, defects, and relevant conditions; repair/replacement processes and correction actions/measures in light water cooled nuclear power plants. Careful application of this Section will help users to comply with applicable regulations within their jurisdictions, while achieving the operational, cost and safety benefits to be gained from the many industry best-practices detailed within these volumes.

Main informations

Collections

ASME code

Publication date

July 2023

Number of pages

0 p.

Reference

ASME BPVC 2023 Section XI Division 1
Sumary
Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components, Division 1, Rules for Inspection and Testing of Components of Light-Water-Cooled Plants

Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied. DIVISION 1 This Division provides rules for the examination, inspection, and testing; NDE methods, qualifications, and requirements; evaluation and acceptance standards for flaws, defects, and relevant conditions; repair/replacement processes and correction actions/measures in light water cooled nuclear power plants. Careful application of this Section will help users to comply with applicable regulations within their jurisdictions, while achieving the operational, cost and safety benefits to be gained from the many industry best-practices detailed within these volumes.